Interfacing solutions for 340 apartments

Working closely with ADG Systems to provide interfacing solutions at the new Wembley Park development

ADG Systems working at the new W03, Wembley Park development are currently commissioning 48 IQ4/XNC devices supplied by Synapsys with our own M-Bus drivers pre-installed to ensure the engineering is simple and efficient. The two block site contains 340 apartments which require the interfacing of Low Temperature Hot Water (LTHW), electric, cold and hot water meters to the Trend BMS.

Synapsys engineer Radek attended site to commission some of the devices and to train the ADG engineers who will complete the rest of the install and commissioning.